Head of International Sales
Ralf Klinge
Contact
While overhead conductor rails allow trains to drive into maintenance and assembly halls under their own power, they are in the way and a potential hazard when work has to be carried out on the roof of the train – the flexible solution is the TracFeed® SAM swivel arm. Motorised and synchronised, it disconnects the overhead conductor rail from the power supply and swings it to the side in just 22 seconds. This immediately creates space for working on the roof, crane operations and lifting systems.
We are a full-service provider for hall projects with swivelling overhead conductor rails. In addition to the overhead conductor rail, swivel arm and control cabinet, which are all produced in-house, we can also offer comprehensive design services and project support.
Please send us your enquiry – we will get back to you as soon as possible.