Traction power supply, AC, National
Osterburken substation
Project details
Client: Deutsche Bahn AG DE
Osterburken, Germany
November 2017 – February 2024

The 1990 substation was completely overhauled. Planning, delivery, installation, commissioning and dismantling of the old substation

  • Planning (electrical engineering, supply cable, structural engineering, traction current line)
  • Construction of the drainage system
  • Foundations for structural engineering, 110 kV system, traction current line
  • Construction and transport, structural engineering
  • Creation of 60 V DC auxiliary power supply system, 230/400 V 50 Hz auxiliary power supply distribution
  • Station control technology
  • Installation of the cabling within the substation
  • Construction of 110 kV switchgear
  • Construction of traction current line
  • Commissioning
  • Complete dismantling of the old substation