Contact lines, International, AC
Tainan City Tunnel
Project details
Client: Cybernation Development Inc., New Taipei City, Taiwan
Tainan, Taiwan
January 2019 – December 2023

As part of the urban development plan, the Tainan train station and a 6.46 km long section of the route will be relocated underground in order to
bring the city, which is divided into two halves by the above-ground railway line, together again visually and functionally. The tunnel will be equipped with the TracFeed® OSS110 overhead conductor rail system under Lot P251 tunnel contact line system.

  • Order value: 2,89 Mio. Euro
  • Length of route (km): 6 km
  • Length of track (km): 13 km

The range of services offered by Rail Power Systems:

  • Systems design, implementation planning
  • Supply of overhead conductor rail system
  • Supervision of installation support services