Traction power supply, AC, National
Coschen interconnector
Project details
Client: Deutsche Bahn AG
Coschen, Germany
February 2022 – November 2023

The 1990 interconnector was completely overhauled. Planning, delivery, installation, commissioning and dismantling.

Our services and products:

  • Delivery, construction and installation of the 15 kV AC switchgear with 2 panels and the protection and control technology in the switchgear building
  • TracFeed® TAA 15 kV/16.7 Hz MV switchgear (2 panels)
  • Provision of the telecommunications connection
  • Construction of a concrete switch house for telecommunications equipment and for local and remote control of the catenary system
  • Supply and construction of 60 V DC auxiliary power supply systems including 50 Hz 230-400 V auxiliary power supply distribution including battery system
  • Structural and civil engineering
  • Installation of the overhead line connection