Systems design, National
Calculation of the influencing effect of feeder cables on LST cables
Project details
Client: DB InfraGO AG
Stendal, Germany
May 2024 – August 2024

A number of remodelling and upgrade measures are being carried out in the overall “Stendal junction” project. The feeder lines along the 6402 route up to the road overpass are routed from the poles into the cable duct. Some of the feeder lines are laid parallel to LST cables. The influence of the feeder line on the LST cables had to be examined. 

Our services and products:

  • CATFIELD
  • Verification of results for compliance with the limit values set out in the DB guidelines 