Systems design, National
Verification of electromagnetic compatibility according to the 26th BImSchV
Project details
Client: SBB AG
Lottstetten - Jestetten Süd, Germany
February 2024 – May 2024

The section of track is being upgraded to double track, which requires an electromagnetic compatibility study to be carried out. The limit values set out in the 26th BImSchV for electric and magnetic fields generated by the OCL system are complied with in locations where people are not only temporarily present.

Our services and products:

  • CATFIELD
  • Verification of results for compliance with the limit values set out in the regulation