Contact lines, National, AC
Lippe railway bridge, Wesel district, ABS 46/2, Oberhausen-Emmerich border section
Project details
Client: DB InfraGO AG
Duisburg, Germany
August 2022 – November 2024

Our services and products:

  • Conversion of the overhead contact line system as part of the track realignment works at the Lippe railway bridge in two construction phases on the ABS 46/2 extension line, section 2270 Oberhausen-Emmerich-German/Dutch border
  • Construction of in-situ concrete and driven pile foundations for 10 flat masts and 16 angle masts with single, double and multiple track cantilevers
  • New construction of 1.7 km of Re200 catenary, conversion of 700 m of catenary
  • Laying of 1.4 km of control cable and 1 km of railway power line
  • Dismantling of 2.5 km of catenary
  • Execution and revision planning