Systems design, International, DC
Load flow study for DART
Project details
Client: Iarnród Éireann
Dublin, Ireland
November 2023 – August 2024

The journey time of trains on the various sections of the network is to be improved between 2025 and 2030. The study shows the effects of improved operation on power consumption, contact line voltage and rail potential.
The effects on operation in the event of a substation failure are also considered in the study. 

Our services and products:

  • Load flow study with Elbas SINANET